Thurber Village

In our inaugural project after our regional expansion, HGC partnered with a Columbus-based developer to construct a 6-story apartment complex that provides an exceptional living experience while enhancing the local community.

Thurber Village, a luxury apartment complex in Columbus, Ohio, is the landmark component of a new commercial development in a central urban area south of Ohio State University’s campus. HGC’s project scope included:

  • 6-story apartment building featuring 229 residential units in dozens of unique styles
  • 350-space parking garage
  • Amenity deck with a pool
  • Outdoor garden

Delivery Method:

Construction Management

Project Type:

New Construction

Industry:

LIVE

Architect:

Dimit Architects

The Challenge

Thurber Village was built as part of a larger commercial development featuring a new drug store, organic food market and parking lot on the corner of a busy urban intersection, near a major highway interchange, in a high-density area. While the new drug store was being built, the old one needed to stay fully functional until its replacement was complete. This meant managing the project so our construction work and material deliveries would not interfere with the store’s customers and deliveries. We needed to maintain parking, accessibility and construction laydown in a tight vicinity.

The same was also true for Thurber Village itself, as the residential units were being leased while the building was under construction. We needed to account for the needs of the property management team and support a positive experience for potential tenants.

While HGC led Preconstruction and site work for the entire development, a third-party construction manager led the construction of the drug store, organic food market and parking lot adjacent to Thurber Village. A shared job site meant an increased demand for collaboration across companies to ensure efficiency and seamlessness.

Finally, Thurber Village’s proximity to several established neighborhoods of tight-knit communities led to frequent queries from curious and concerned local residents wondering about the noise, the timeline, and the final product.

Continuous communication was key too. By maintaining open lines of communication between internal and external teams, we promoted collaboration and proactive problem solving so unforeseen circumstances and challenges were addressed quickly and effectively. 

The Solutions

Our meticulous Preconstruction process laid the groundwork for a successful project by developing a comprehensive plan to mitigate risk, minimize costs and reduce schedule impacts. We anticipated the potential hazards and hardships of such a congested job site, so we implemented targeted procedures and engaged in ongoing dialogue with all parties to navigate logistical challenges. 

While the leasing office within Thurber Village was still under construction, we converted a maintenance office into a temporary leasing space where agents could meet with prospective residents and continue building occupancy. 

We met concerns from local residents with empathy and understanding, and assured them our goals for a beautiful development that would elevate the area aligned with theirs. We gave back when we could, such as donating to a local trash cleanup, further emphasizing our commitment to enhancing the local community.

 

Let’s build your vision.

And with our collaborative, solutions-oriented approach, we’ll build a lasting partnership too.

Get In Touch

Rumpke Covington Public Work

To support Rumpke’s increased need at their Covington Public Works in Northern Kentucky, we led the demolition of an existing waste transfer facility and built one that was more than 40 percent bigger.

Rumpke partnered with HGC to significantly increase the size of their operations and modernize their maintenance space. Site work required laying six acres of 8-inch-thick pavement, a 12-inch gravel base with geogrid, and a ballistic concrete foundation reinforced with steel fiber. All told, we poured 2,000 cubic yards of concrete to form the site. The project scope also included:

  • New 26,000-square-foot pre-engineered transfer facility including seven truck bays
  • Installation of all site utilities, including mechanical, electric and plumbing
  • Demolition of the existing 15,000-square-foot steel frame transfer station and existing elevated structural slab and concrete
  • Renovated maintenance building

Delivery Method:

Construction Management

Project Type:

Renovation and New Construction

Industry:

WORK

Architect:

Luminaut

The Challenges

Because this was an active waste transfer facility servicing four counties, all operations needed to remain at 100 percent for the duration of the project. We knew accommodating this would require meticulous planning and deep coordination throughout. Plans were further complicated by a late-stage change to the truck fueling system after schedules were already in place. 

In addition, during the demolition of the existing transfer facility, we discovered contaminated soil below the site, an environmental issue with safety and compliance implications demanding immediate attention.

Rumpke’s decision to incorporate a compressed natural gas fueling system meant significant shifts to our core plans. But thanks to our solutions-oriented approach and ingrained problem-solving culture, we were able to accommodate the change with ease.

The Solutions

To keep the transfer facility running smoothly, we split the project into two phases. During phase one, we built a new transfer station on an unused portion of the property. Once that work was complete, Rumpke moved operations to the new facility while we demolished the old transfer station. Preventing disruptions to hauling operations, which were managed by a third party and fluctuated day to day, was a feat of communication and coordination.

Soon after demolition began, we uncovered contaminated soil below ground. Fortunately, this discovery was not a surprise. Our research and findings during our meticulous Preconstruction process alerted us to this possibility and we planned accordingly, developing multiple contingency plans we could enact based on what we found when we started digging. Thanks to rigorous front-end preparation, we were equipped to quickly take action, immediately partnering with Rumpke personnel and EPA officials to safely handle, discard, and encase the contaminated soil while mitigating delays and minimizing costs.

Let’s build your vision.

And with our collaborative, solutions-oriented approach, we’ll build a lasting partnership too.

Get In Touch

Centre College Athletics

Centre College saw an opportunity to enhance the campus experience for students and athletes and boost recruitment efforts by investing in three new and renovated sports facilities. Together we partnered to create:

  • A new baseball stadium, now recognized as one of the best Division III facilities in the nation, built on the site of a former waste receptacle station, which required complete demolition 
  • A new football field and facility, replacing the 100-year-old stadium with an NCAA-regulation turf field, 8-lane track, public restrooms, concessions areas, geothermal wells, and more
  • A comprehensive athletics complex, featuring a state-of-the-art fieldhouse, premier natatorium, 6,000-square-foot fitness center and more
  • A landmark 50-foot clock tower and pathway, which serves as the gateway to the new athletic facilities

Delivery Method:

Construction Management

Project Type:

New Construction and Renovation

Industry:

LEARN | PLAY

Architect:

MSA Sport

The Challenges

Simultaneously constructing three new facilities on an active college campus brought multiple layers of complexities, from logistical constraints and tight laydown areas to safety and compliance considerations. Our work spanned multiple academic years (and college campuses never truly close), so our teams were constantly working alongside the hustle and bustle of busy students, faculty and staff. Due to the size and scope of the project, coordinating vast teams of subcontractors to promote efficiency and adhere to schedules was another challenging demand. In addition, the COVID-19 pandemic brought its own set of complications with material and supply delays.

The Solutions

Constant communication between HGC and Centre College was paramount. We collaborated across all teams at all touchpoints, from scheduling material deliveries to fit supplier constraints while minimizing campus disruptions, to managing subcontractor workflows to accommodate simultaneous high-priority needs. We leveraged our vast experience with and commitment to sustainable construction to equip the new fieldhouse and natatorium with geothermal energy and the fieldhouse with solar panels, achieving LEED Gold certification. Despite a rigorous Preconstruction process that laid a strong foundation for a seamless project, unforeseen challenges arose — but we met them with the agility, tenacity and problem-solving spirit that defines our culture and sets our work apart. The result is a best-in-class athletics complex that will continue to enhance the Centre College experience for generations to come.

 

Images provided by MSA Design

Let’s build your vision.

And with our collaborative, solutions-oriented approach, we’ll build a lasting partnership too.

Get In Touch

Sycamore Community Schools

Through meticulous planning and innovative thinking, we helped Sycamore Community Schools realize their vision for new and improved learning environments while limiting disruptions to their students

HGC has partnered with Sycamore Community Schools on several renovation, expansion and new construction projects to meet the needs of their growing school community. Our work includes:

  • Renovation and expansion of Symmes Elementary
  • Full interior renovation, new exterior main entry, relocated bus lot, new gym floor and renovated locker rooms at Sycamore High School
  • Renovated Sycamore High School natatorium, an extensive project that required major demolition efforts to support a new 75-foot, 8-lane competition pool
  • Site work and prep of a new turf field, parking lot, concessions and restroom building, field house and additional site improvements at Sycamore Athletics Facility

Delivery Method:

Construction Management

Project Type:

Renovation and New Construction

Industry:

LEARN

Architect:

SHP

The Challenges

One of the most challenging aspects of school construction projects is completing the necessary work without disturbing students as they’re trying to learn. Often, major construction is reserved for summer months, which can delay timelines and bloat budgets. 

The renovation of the Seger Family Natatorium was a challenging project in and of itself. In addition to the complete demolition of the existing pool and superstructure, our team needed to remove two exterior walls, the roof and all MEP systems to pave the way for a significant expansion and modernization of the facility.

Project time frame

HGC shortened this project time frame from four years to 2.5 years through innovative solutions that kept construction going year round.

The Solutions

To support the deep excavation required for the new, larger pool, we installed a lagging system with drilled caissons to safeguard the existing school foundations. This new superstructure is built to last, featuring CMU and steel bearing walls, long-span joist girders, a durable new roof and a brick veneer exterior that blends seamlessly with the existing architecture.

To enable our teams to work on the Sycamore High School project year round without disrupting students or encroaching on classroom space, we repurposed existing areas within the building to construct 17 temporary classrooms, temporary offices for administration and counseling, and a temporary kitchen. This avoided the need for trailers (something the school was adamantly against) and allowed the school to maintain the same number of classrooms inside the building while supporting other student needs. We also constructed a new two-story glass-enclosed space inside the existing library, which provided an additional temporary classroom for the remainder of the project as well as a new book room for the library.

Backed by years of experience with both K–12 and higher education construction projects, our solutions-oriented approach enables us to employ innovative strategies and navigate logistical challenges to keep students learning while we improve their spaces. Learn more about how we do it here.

Hard work. Craftsmanship. Putting the customer first. Doing it right.

Our business was built on these values — and they continue to drive our people, our projects and our culture today.

Get To Know Us

Taft Museum of Art

Built around 1820, the Taft Museum of Art is a National Historic Landmark and the oldest freestanding wood structure in its original location in Cincinnati.

This 200-year-old house, which holds a priceless art collection featuring the work of some of the world’s leading artists, was in dire need of renovation. The historic home was in disrepair, with significant water damage to the wood siding and overall structure. To restore the museum to its former glory and to achieve a climate-controlled environment suitable to preserving the artwork, the scope of this work included:

  • Foundation repairs and waterproofing
  • Site stonework
  • Wood siding removal and replacement
  • Window grilles and fencing
  • Casework and millwork
  • HVAC replacement

Delivery Method:

Construction Management

Project Type:

Historic Preservation

Industry:

PLAY

Architect:

GBBN Architects

The Challenges

Because of the historic nature of the building, all our work was required to follow strict historic preservation standards, such as limiting noise, monitoring vibrations, and maintaining tight temperature and humidity levels to protect the artwork. We also worked around asbestos, an underground cistern, and in an environment with very tight logistics. We removed all existing HVAC equipment from attic spaces and replaced them with new, modern equipment — all through a single 3-by-5-foot hatch.

I always had the sense that the HGC leadership and their staff handled our project as if it was their very own home. They demonstrated care of the structure and understood its historic importance. There were lots and lots of hoops for HGC to jump through to get the project right. One example: You must perform all work on this project without causing vibrations — no drills or anything that could damage the murals that are painted directly on 200-year-old plaster! I am pleased to share that they did a magnificent job.

Deborah Emont Scot

Director Emerita,
Taft Museum of Art

Once work was complete, Taft’s Director Emerita, Deborah Emont Scott, remarked: “We believe we have fixed this house up for another hundred years.”

The Solutions

Before any construction to the historic house began, our team engaged a historic consultant and spent a year in preconstruction and design to align on a budget and complete value engineering exercises. We addressed an urgent concern — rotting structural framing — by shoring up the house to replace the structural members, then removed all wooden boards that made up the exterior skin. We installed a rain screen and vapor barrier behind the interior walls, and utilized an environmental safe chamber to remove asbestos behind the siding. The initial plan called for tongue and groove siding, but we discovered that a shiplap assembly was a better option for water protection and gave the same historic look on the outside.

Another pressing issue involved short cycling air. Since almost every room had a fireplace, we proposed repurposing these old fireplaces and chimney flues as return-air paths to allow for cross-room ventilation

Hard work. Craftsmanship. Putting the customer first. Doing it right.

Our business was built on these values — and they continue to drive our people, our projects and our culture today.

Get To Know Us

Factory 52

This $86 million redevelopment project transformed a historic playing card factory into a vibrant living community and entertainment destination.

The former U.S. Playing Card Co. factory is a beloved and storied institution in Cincinnati’s historic Norwood. After years of discussion, the 22-acre site was finally redeveloped into a “city within a city” where people can live, work and explore.

The scope included a large amount of demolition and site work to make way for:

  • construction of eight new or renovated buildings that house apartments, retail shops, restaurants, brewpubs and more
  • restoration of several historic elements of original structures, including the clocktower, smokestack, factory building and food hall
  • a central “town square” featuring an amphitheater and stage

Delivery Method:

Construction Management

Project Type:

Renovation and New Construction

Industry:

LIVE | WORK | PLAY

Architect:

MSA Design

The Challenges

Simultaneously developing a 15-acre park while renovating and constructing eight buildings was a challenge that demanded seamless coordination. The HGC project team alone consisted of 15 dedicated individuals overseeing multiple projects. Factory 52’s proximity to major train tracks, an active factory, and a busy highway posed additional logistical challenges that required careful negotiation and cooperation with various stakeholders.

600K
square feet of finished space
22
acres of development
$86m
contract value
18 mo.
Length of project

We integrated the use of QR codes into Procore, revolutionizing the punch list process for subcontractors. This streamlined approach empowered subcontractors to efficiently address tasks by scanning QR codes, expediting workflows and enhancing overall project coordination. We also used Earthcam’s 360 robotic cameras to assist with site monitoring, providing visibility to all eight building projects at once.

The Solutions

Given the scope and size of the project, we knew effective communication would be paramount, so we routinely scheduled internal meetings to discuss things like deliveries, sharing resources within subcontractors, and when work on the north side of one building might affect the work on the south side of an adjacent building.

Navigating within the right-of-way of the train tracks, alongside a designated park area where deliveries were restricted, required innovative solutions. We established clear communication channels and incorporated signage to strategically route deliveries through designated paths with minimal disruption to the city of Norwood.

Despite the challenge of the tight site, with numerous subcontractors operating simultaneously, careful planning and coordination ensured seamless progress across all fronts.

Specialty Trades

By subcontracting specialists from within Huseman Group, we provide an unparalleled level of craftsmanship while delivering maximum value to our clients.