Skip to main content

Location: Cincinnati, OH
Schedule: April 2017 – March 2018
Cost: $11,000,000
Customer: Rumpke
Architect: Luminaut (formerly Architects Plus)

The container maintenance facility is used to upkeep all Rumpke trucks and store waste/recycle bins. This facility will house Rumpke’s tire shop, welding and painting operations. New and innovative features include a power washing area, sanding rooms with high-tech filtration systems, and painting stations. Our building processes included concrete tilt-up construction and metal siding hybrid.

The exterior of the new Rumpke repair facility. A large gray, rectangular building. Small square windows line the first story. Accents of red are on the wall. The Rumpke logo is displayed, centered on the top of the building. The ground around the building is covered with hay, and the sky is blue with wispy clouds.
The exterior of the new Rumpke truck repair facility. The building is gray. A dark gray border lines the bottom, a red strip crosses the lower midsection of the building, and the upper section is light gray. Seven large closed garage doors with small windows line the building. The eighth, farthest in the distance, is half open and a chrome pick up truck sits in front of it.
A large industrial garage for repairing trash and recycling trucks. The entire facility is very gray, with cement floors and corrugated metal roofing. Fluorescent lighting. A pedestrian walkway, painted yellow on the floor, heads to the left of the frame and then turns to the right. Large brown dumpsters are placed throughout the warehouse space, to be cleaned or repaired.
A large industrial garage for repairing trash and recycling trucks. The entire facility is very gray, with cement floors and corrugated metal roofing. Fluorescent lighting. To the left is a dirty garbage truck. In the center is a dark green, large trash dumpster. To the right and in the background is a bright, clean and white garbage truck with the red Rumpke logo. A variety of tools and equipment are seen throughout the facility. Yellow stripes indicate the pedestrian walkways within the facility. Four garage doors line the far wall.
A large industrial garage for storing trash and recycling bins. The entire facility is very gray, with cement floors and corrugated metal roofing. Fluorescent lighting. Yellow stripes indicate the pedestrian walkways within the facility, and in the far left is a staircase leading to second floor. The stair railing is bright yellow, as is the second floor railing, which can be seen from the first floor.
A large industrial garage for repairing trash and recycling trucks. The entire facility is very gray, with cement floors and corrugated metal roofing. Fluorescent lighting. Yellow stripes indicate the pedestrian walkways within the facility, and tires are stored in racks throughout the large and open room. Four garage doors line the far wall.

Similar Work