Skip to main content

Location: Forest Park, OH
Schedule: 5 Months
Customer: Spectrum (Time Warner Cable)
Size: 1,200 SF
Architect: Cornette/Violetta Architects, LLC

HGC Construction provided design/build construction services to Spectrum (formerly Time Warner Cable) to expand the square footage of their existing hubsite facility. The project was constructed around a smaller existing building that required all equipment to stay connected and online during the overbuild of the building. Three walls of the existing structure were incorporated into the exterior skin of the new building. Once the entire shell was enclosed the interior wall of the original building was removed while supporting the roof structure of the original building.

By building over the original structure, HGC was able to eliminate multiple service interruptions and incurred costs from the potential loss of service.

Similar Work

We Are HGC

At HGC, we build every day. From state-of-the-art fulfillment stations and complex renovations, to innovative zoological and industrial structures, we work across all markets. Our foundation is built upon solid relationships with both public and private clients. They repeatedly rely upon our broad expertise and experience to make their visions a reality. Our commitment to our clients never ends. We stand behind our work and get the job done right every time. Doing so has been part of HGC’s culture for over eighty-seven years. No matter the project, we promise to deliver to you an outcome that blows you away, until we build again.