Skip to main content

Location: Cincinnati, OH
Schedule: September 2018 – May 2019
Customer:  Christ Church Cathedral 
Size: 6,500 SF
Architect: TDA Architects

 

After great success on the renovation of Christ Church Cathedral’s Centennial Chapel and Sycamore Commons, HGC was tasked with a Design-Build called the Nave Organ Project. The job was a highly detailed renovation of the Cathedral Nave in preparation for a new Richards Fowkes & Co 4,000 pipe organ.

Scope included:

  • careful acoustic studies
  • installation of acoustic panels
  • new floor tiles
  • additional renovated spaces, including music room and media control room
  • enlarged Chancel, in preparation for .

Construction schedule and logistics were carefully managed to allow full occupancy and regular worship schedule throughout the duration of project.

Interior of Christ Church Cathedral
Interior of Christ Church Cathedral
Interior of Christ Church Cathedral
Interior of acoustic panels as part of Christ Church Cathedral Nave Organ Project
Ceiling detail of Christ Church Cathedral
Community room at Christ Church Cathedral
Interior of Christ Church Cathedral
Media control room at Christ Church Cathedral
Exterior of Christ Church Cathedral

Similar Work